Landology as a Subcontractor, acquired and planted 60 trees along Newtown Road in El Dorado Hills, Ca for the El Dorado Department of Transportation. This project was completed in June of 2024.
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley.
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley.
Willows Installed
Elderberry Transplanted
PLANTS AND TREES INSTALLED
ACRES MITIGATION
RESIDENTIAL Fire Restoration
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley.
Landology as a Subcontractor, acquired and planted 60 trees along Newtown Road in El Dorado Hills, Ca for the El Dorado Department of Transportation. This project was completed in June of 2024.
Landology removed 323 trees and associated vegetation along 3 sections of the Sacramento Levee. Following the tree removal, 12 elderberries were transplanted. This work was performed as a prime contractor for USACE and was completed in February of 2020.
Landology planted over 13,000 riparian, upland and floodplain forest native plants, 1,200 willows and completed native seeding with a design build irrigation system during Phase 2 of the habitat mitigation planting along the Lower American River.
Landology as a Prime Contractor for the City of Rocklin planted 2722 trees and shrubs on the Sierra College Boulevard and Interstate 80 Interchange. This project was completed in December of 2019.
Landology installed 4540 native plants on a 2-acre site in the dunes of Santa Barbara. This work was performed as a Prime Contractor for the City of Santa Barbara and was completed in August of 2019.
Landology as a Prime Contractor for Caltrans installed and maintained 12 native plants in Coalinga, Ca. This project was completed in December of 2020.
Landology as a Prime Contractor for the City of Santa Barbara, hand broadcasted seed, harvested and installed 1000 live willow poles, planted 7475 woody native plants with an irrigation system, and placed 1.96-acres of erosion control fabric with bio-wattles and coir logs on a 3.3-acre site along the Arroyo Burro Creek.
Landology installed erosion control on a total of 662 home lots in Coleville, Shaver Lake, Springville, and Little Rock in California. This work was performed as a Subcontractor and was completed in November of 2021.
Landology as a Subcontractor, harvested and installed 130 live willow cuttings in Lincoln, California. This work was completed in February of 2021.
Landology as a Prime Contractor for USACE, removed over 2000 trees and vegetation, transplanted 10 elderberries, completed drill seeding, and installation of native material and willows with an irrigation system on a mitigation site at Rio Ramaza. This project is currently in the last year of a 4-year maintenance period.
Landology removed 650 trees and associated vegetation along a 6-mile stretch of Garden Highway. The trees and vegetation were chipped and off hauled. Landology completed this project as a Prime Contractor for USACE in February of 2022.
Landology as a Subcontractor, completed native hydroseeding on a 71-acre site in Sacramento, California. This project was for USACE and was completed in April of 2022.
Landology as a Prime Contractor for USACE, planted over 10,000 riparian, upland and floodplain forest native plants, 1,000 willows and completed native seeding along with a design build irrigation system in Phase 1 of Site 2-2 of the habitat mitigation planting along the Lower American River.
Landology as a Prime Contractor, installed concrete cobblestone under a bridge. This project was for the City of Brentwood and was completed in September of 2022.
Landology as a Subcontractor, installed 12000 native plants, 400 willows and a 5-acre wetland on a 110-acre mitigation site in Fremont, Ca. This project was for the East Bay Regional Park District.
Landology as a Prime Contractor, completed 26 miles of weed eating on each side of a canal from Folsom, Ca to Galt, Ca. This project was for the Bureau of Reclamation and was completed in October of 2023.
Landology as a Subcontractor, harvested and installed 956 willow cuttings, planting benches and 950,000 sf of Coir 900 erosion blanket over engineered soil at the new levee repair. This work was completed for the USACE in May of 2023.
Landology as a Subcontractor, harvested and installed 75 live willow cuttings in Sacramento, California. This work was completed for the USACE in November of 2019.
Landology as a Subcontractor, installed 750,600 sf of erosion control blanket around a detention basin in Lincoln, California. This project was completed in October of 2019.
Landology removed 433 trees and associated vegetation, transplanted over 24 elderberries, planted 5200 native plants with a design build irrigation system, and installed 595 willows at the Atkinson mitigation site. This project required the establishment and maintenance of a dirt road, drilling a well, watering, weeding, mowing, spraying, and plant surveying. Landology completed this project as a Prime Contractor for USACE in 2024 after a 4-year maintenance period.
Landology removed 6 raised garden beds and tree benches to replace with new beds and benches made with composite boards in Sacramento, California. Landology performed this work as a Prime Contractor for GSA Public Buildings Service and the project was completed in November of 2022.
Landology regraded drainage canals and implemented an additional drainage outlet with drainage pipe in Weldon, California. Landology performed this work as a Prime Contractor for Ducks Unlimited and the project was completed in December of 2022.
Landology as a Subcontractor, harvested and installed 300 live willow cuttings in Lincoln, California.
Landology as the Prime Contractor completed hydroseeding of 1.1-acres and installation of over 400 native shrubs with a design build irrigation system along the Sacramento River. This project for USACE was completed in December of 2023.
Landology as a Prime Contractor, harvested and transplanted 30 elderberry plants in Sacramento, California. This work was completed for the USACE in May of 2020.
Landology as a Prime Contractor for USACE removed 400 trees and 5-acres of vegetation, harvested and transplanted 138 elderberries, installed 4500 native plants and grasses, along with beaver and rope fencing to preserve the plants. This project has a 5-year maintenance period and construction was completed in October of 2023.
Landology as a Subcontractor, completed erosion control on 23 residential home lots in Foresthill, California after the Mosquito Fire. This work was performed for the County of Placer and was completed in May of 2023.
Landology as a Subcontractor, harvested and installed 150 live willow cuttings in Lincoln, California. This project was completed in April of 2023.
Landology as a Prime Contractor, installed 1000 plants with an irrigation system in Loma Linda, California. This work was performed for the U.S. Department of Veterans Affairs and was completed in December of 2019.
Landology removed beaver fencing and irrigation piping from previous USACE projects at 5 separate locations along the Sacramento River and its tributaries. Landology performed this work as a Prime Contractor to USACE and completed this project in September of 2023.
Landology as a Prime Contractor for the Bureau of Reclamation, planted 2672 acorns on a 15-acre mitigation site. Construction was completed in 2019, and the 4-year maintenance period was completed in September of 2023.
Landology harvested and installed 1500 willow cuttings along the American River. This work was performed as a Prime Contractor for the USACE, and construction was completed in 2024. This project is currently in the 1st year of a 5-year maintenance period.
Landology removed over 430 trees along a 9 mile stretch of the Natomas Basin by cutting down, pruning back, chipping, loading and off-hauling logs, branches and twigs. Landology performed this work as a Prime Contractor for USACE, and the project was completed in December of 2023.
Landology trimmed and removed a total of 9,059 lf of trees and vegetation on 12 sites along the Sacramento River and Steamboat Slough. Landology as the Prime Contractor completed this work for USACE in April of 2024.
Landology as a Prime Contractor for USACE, harvested and transplanted 26 elderberry shrubs at the Lower San Joaquin TS30L Levee in Stockton. This project included biological and cultural monitoring, GPS As-builts, and a 1-year maintenance period.
Landology as a Subcontractor, harvested and installed 280 live willow cuttings along the American River in Sacramento, California. This work was completed for the USACE in July of 2024.
Landology excavated and transplanted 62 elderberry shrubs with a temporary irrigation system and provided GPS As-builts for the new locations of the elderberries. This work was performed as a subcontractor and the project was completed in September of 2024.
Landology as a Subcontractor, harvested and installed 400 live willow cuttings in Woodland, California. This project was completed in November of 2024.
Landology as a subcontractor, harvested and installed 4600 live willow cuttings along the Tuolumne River in La Grange, California. This project was completed in October of 2024.
Landology as a subcontractor, harvested and installed 234 live willow cuttings in Santa Cruz, California. This project was completed in October of 2024.
Landology harvested and installed 950 live willow cuttings in Hopeton, California. This work was performed as a subcontractor and was completed in November of 2024.
Landology as a subcontractor, installed fiber rolls in Sacramento, California. This project was completed in October of 2015.
Landology removed 15 large trees and shrubs in front of a Federal Building in Sacramento, California. Landology performed this work as a Prime Contractor for the General Services Administration and the work was completed in June of 2016.
Landology installed 5000 plants with an irrigation system in Folsom, California. This work was performed as a Prime Contractor for USACE and was completed in May of 2020.
Landology as a Prime Contractor for the County of Santa Barbara, planted 1062 native trees and shrubs on a 3-acre mitigation site in Lompoc, California. This project was completed in July of 2018.
Landology as a Subcontractor, harvested and installed 88 live willow cuttings in Sacramento, California. This project was completed for Great Lakes Environmental in October of 2017.
Landology removed 206-acres of orchard, and the material was chipped and off hauled. Once the orchard was removed, the field was graded, disked, and sprayed with herbicide over the course of 2 years. Landology performed this work as a Prime Contractor for USACE and completed the project in April of 2020.