FEATURED PROJECTS

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley.

TULE RIVER ATRIPLEX AND RIPARIAN REVEGETATION MITIGATION PROJECT

ISABELLA LAKE – DAM SAFETY MODIFICATION PROJECT

ATLAS NUNS, POCKET, REDWOOD VALLEY, SULPHER & TUBBS FIRE

MITIGATION PLANTING AND ESTABLISHMENT – LAKE ISABELLA DAM MITIGATION PROJECT

PROJECTS MAP

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley.

RESULTS

Willows Installed

16311

Elderberry Transplanted

312

PLANTS AND TREES INSTALLED

147489

ACRES MITIGATION

468.4

RESIDENTIAL Fire Restoration

2685

PAST PROJECTS

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley.

AMERICAN RIVER LAR 3A

Landology as a Subcontractor installed 3-acres of coir 700 erosion fabric and 13000 LF of 12" coir logs to stabilize the levee along the American River in Sacramento, CA. Temporary irrigation was also installed for long-term watering of the hydroseed. This project was completed in January of 2026.

RANCHO CANADA FLOODPLAIN RESTORATION

Landology as a Subcontractor is to install a temporary irrigation system utilizing and refurbishing existing water wells, harvest and plant over 30000 willow cuttings, and plant over 140000 native plants into the designated floodplain locations on site in Carmel, CA. This project began in 2025 and is currently in the 1st

SACRAMENTO RIVER EROSION PROTECTION

Landology as a Prime Contractor for USACE harvested and planted 1500 willow cuttings, planted 10400 native plants, hydroseeded 3 acres and designed and built a temporary irrigation system along the Sacramento River in 2025. This project is currently in the 1st year of a 4-year maintenance period.

NEWTOWN ROAD TREE PLANTING

Landology as a Subcontractor, acquired and planted 60 trees along Newton Road in El Dorado Hills, Ca for the El Dorado Department of Transportation. This project was completed in June of 2024.

Landology as a Subcontractor, acquired and planted 60 trees along Newtown Road in El Dorado Hills, Ca for the El Dorado Department of Transportation. This project was completed in June of 2024.

WRDA 16 TREE REMOVAL

Landology removed 323 trees and associated vegetation along 3 sections of the Sacramento Levee. Following the tree removal, 12 elderberries were transplanted. This work was performed as a prime contractor for USACE and was completed in February of 2020.

Landology removed 323 trees and associated vegetation along 3 sections of the Sacramento Levee. Following the tree removal, 12 elderberries were transplanted. This work was performed as a prime contractor for USACE and was completed in February of 2020.

ARCF LOWER AMERICAN RIVER SITE 2-3 PHASE 2

Landology planted over 13,000 riparian, upland and floodplain forest native plants, 1,200 willows and completed native seeding with a design build irrigation system during Phase 2 of the habitat mitigation planting along the Lower American River.

Landology planted over 13,000 riparian, upland and floodplain forest native plants, 1,200 willows and completed native seeding with a design build irrigation system during Phase 2 of the habitat mitigation planting along the Lower American River.