Landology was a key subcontractor tasked with the installation of all hydroseed and erosion control work on this USACE dam and spillway safety upgrade project. The major work elements included hydroseeding over 100-acres and installing over 200,000/lf of bio wattles and 30,000/lf of silt fence.