Lower San Joaquin 14-Mile Slough Pump Station Site Mitigation

Landology as the Prime contractor mitigated a 62-acre site for Riparian and wetland planting. This USACE project includes the construction of a 14.5-acre wetland, installation of over 31,000 native plants, native drill seeding and a design-build irrigation system. Following construction and installation in 2026 there will be a 5-year maintenance period.

Landology as the Prime contractor mitigated a 62-acre site for Riparian and wetland planting. This USACE project includes the construction of a 14.5-acre wetland, installation of over 31,000 native plants, native drill seeding and a design-build irrigation system. Following construction and installation in 2026 there will be a 5-year maintenance period.

RELATED PROJECTS

TULE RIVER ATRIPLEX AND RIPARIAN REVEGETATION MITIGATION PROJECT

A 138-acre habitat mitigation project with 2 sites being mitigated for Atriplex Complex and Riparian

ISABELLA LAKE – DAM SAFETY MODIFICATION PROJECT

Landology was a key subcontractor tasked with the installation of all hydroseed and erosion control

ATLAS NUNS, POCKET, REDWOOD VALLEY, SULPHER & TUBBS FIRE

Landology was a key subcontractor to AshBritt Environmental in the 2017’ Northern California Wildfire Debris